Site forcing
The reframe
A harbour has two kinds of wetted surface and treating them the same is the error that makes fouling management expensive and ecologically negative at the same time.
Surfaces where growth costs function (intake screens, heat exchangers, moving parts, inspection windows, load-critical members) need suppression, and the only question is which suppression.
Surfaces where growth costs nothing (quay walls below the tide line, pile jackets, riprap, fender faces) are free hard substrate in a system that has usually lost most of its natural hard substrate. Suppressing those pays money to destroy habitat and adds copper to the sediment for no operational return.
Lorica forces that allocation to be explicit per surface. The nature-based half of the product is not only the bio-derived coating: it is the decision to stop coating the surfaces that never needed it, which is usually the larger effect and is free.
Asset surfaces · edit inline, the verdict recomputes
| Surface | Area m² | Depth band | Flow | Fouling costs what | Access | Pressure | Conseq. | Risk | Verdict |
|---|
Choose a surface
What are you optimising for
Ranked options
Wetted area allocation
Plan by surface
| Surface | Verdict | Selected option | Area m² | kg Cu/yr | €/yr | Evidence |
|---|
Intervention coefficients · all editable, all assumptions
| Option | Class | Efficacy | Durability yr | kg Cu/m²/yr | €/m² capex | €/m²/yr opex | Evidence |
|---|
Where the numbers come from
The one coefficient that decides the POC
Everything about whether a chitosan coating wins a procurement decision collapses into one number: how long it lasts in the water. Its efficacy is roughly known from panel work, its biocide load is zero by construction, and its cost per square metre is a manufacturing question. Durability is the only input that is both unmeasured and decisive, because a coating that must be reapplied annually is annualised against one year of capex and loses to an incumbent that lasts four.
So this tab does not ask what chitosan scores. It asks how many years it would have to survive to beat the best non-bio-based option available on this surface. That is the target the phase 1 panel array exists to hit or miss, stated as a number before the array goes in the water rather than rationalised after it comes out.
Score against durability